Zhongshan Qinglong Chemical Building Materials Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. zhang jessie
  • Company Name : Zhongshan Qinglong Chemical Building Materials Co., Ltd.
  • Tel : 86-760-88706351
  • Fax : 86-760-88706350
  • Address : Guangdong,zhongshan,da nansha bridge,east,gangkou town,zhongshan city
  • Country/Region : China
  • Zip : 528400

Aluminium foil waterproof membrane

Aluminium foil waterproof membrane
Product Detailed
Related Categories:Waterproof Membrane
ASTM Standarded manufacturer of membrane wigth high quality and the best price roll size:15-20sqm/roll thickness:1.2~2.0mm

 1.Description:

MQ202 Waterproof Membrane materials using  polyester reinforcement for waterproofing is a new type of wateproof material,it's made from  polyester felt as its reinforcement featuring high strength,elongation amd corrision resistance, SBS compound as its modifier for meeting the torched-on applications, it shall be covered with polyethylene membrane(PE),aluminium foil, colorful sand or mineral granule on its top surface and polyethylene membrane(PE)coated on its under face. This series of membrane is designed for the waterproofing of underground construction such as tunnel, subway, basement,roofs and pools etc.      

 

2.The special formulation of fire enables the membrane to be applied directly with primer. This application is named as “Torched on application”. 

SBS Membrane installation procedure:

 

1.Base processing:the base surface must be clean,solid,level,dry;no grit,rift and loosing dust. For a large recess,fill it with cement mortar and then level it. Remove the protrusion and clean dust.If working on base slab or lateral face,water lowering should be done.

 

2. Painting primer:before laying the membrane,clean the dust on the surface of concrete base with dust catcher or dust-blower;then paint entirely with treatment agent of DY primer for waterproofing(for purpose of dust consolidation and high adhesive effect).

 

3.Heat to melt: place membrane correctly, fire torch, heat the membrane with base entirely, when the surface of the membrane is black and bright with a fusion layer, apply the membrane and press it into a solid and flat state.Before the membrane is cool, seal the edge of joint by float.

 

4.Requirements for lapping: There should be less than 3 layers of lapping, with the joint seams appearing as"T" type,avoid 4 layers of lapping.The width of longitudinal lapping is between 50 and 80mm,and of end-lap joint 100mm

 

 

4. Package and transportation:

Membranes should be stored under dry and ventilated conditions.

Different types of membranes must be piled separately.

Under usual condition, storage period is one year since production date.

Membrane roll should be put vertically during transportation. It should be kept away from sunshine and rainwater.

 

5. Requirements for surroundings:

The base should be dry and clean. Do not work in the rainy or snowy day.

Do not work under heavy wind(above 5 grade)

Unsuitable for construction below 0°C

If it is rain or snow in the process of construction, protective measure to the laid membrane is must.

 

6. Technical property:

SBS Waterproof Membarne       Reinforced base

PY 

G

Type

I

II

I

II

Content of soluble substances(g/m2)≥

2mm

 

1300

3mm

2100

4mm

2900

Water impermeability

Pressure (Map)

0.3

0.2

0.3

Retention time (min)

Impermeability within 30 min

Heat resistance °C

90

105     

90

105

Tensile strengthN/50mm≥

Longitudinal

450

800

350

500

Transverse

250

500

Elongation at break %≥

Longitudinal

30%

40%

-------

-------

Transverse

Tear strength  N≥

Longitudinal

250

350

250

350

Transverse

170

200

Low temperature flexibility°C

-18

-25

-18

-25

Aluminium foil waterproof membrane



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.